{"id":12051,"date":"2022-11-14T10:10:28","date_gmt":"2022-11-14T10:10:28","guid":{"rendered":"https:\/\/www.newprojectstracker.com\/blog\/?p=12051"},"modified":"2023-01-25T10:06:24","modified_gmt":"2023-01-25T10:06:24","slug":"alstom-bags-rs-798-croreorder-to-manufacture-78-coaches-for-chennai-metro","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/alstom-bags-rs-798-croreorder-to-manufacture-78-coaches-for-chennai-metro\/","title":{"rendered":"Alstom bags Rs 798 croreorder to manufacture 78 coaches for Chennai Metro"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/12051?pdf=12051\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img class=\"\" src=\"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/07\/Chennai-Airport-Kilambakkam-Metro-project-all-set-to-begin.jpg\" width=\"524\" height=\"327\" \/><\/p>\n<p>Alstom, a French producer of rolling stock, announced that <a href=\"https:\/\/chennaimetrorail.org\/\">Chennai Metro Rail Limited<\/a> has awarded them a contract for the design, production, and commissioning of 78 advanced metro coaches costing 98 million euros, or roughly Rs 798 crore (CMRL).<\/p>\n<p>Between Poonamallee Bypass and Light House, a 26 km line that is a part of Phase-II, these new metro vehicles will run, stopping at 28 stops (18 elevated and 10 underground).<\/p>\n<p>The contract&#8217;s scope includes both the production of 26 metro trains (three-car arrangement) with a top speed of 80 kmph as well as staff training.<\/p>\n<p>Alstom&#8217;s Metropolis metros will provide safe and dependable passenger transportation for the city&#8217;s roughly 11 million residents with a 25 KV power supply for maximum energy efficiency.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report Alstom, a French producer of rolling stock, announced that Chennai Metro Rail Limited has awarded them a contract for the design, production, and commissioning of 78 advanced metro coaches costing&#8230; <\/p>\n","protected":false},"author":1,"featured_media":9974,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[163],"tags":[285],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/07\/Chennai-Airport-Kilambakkam-Metro-project-all-set-to-begin.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/12051"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=12051"}],"version-history":[{"count":1,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/12051\/revisions"}],"predecessor-version":[{"id":12052,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/12051\/revisions\/12052"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/9974"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=12051"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=12051"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=12051"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}