{"id":12040,"date":"2022-11-11T07:05:41","date_gmt":"2022-11-11T07:05:41","guid":{"rendered":"https:\/\/newprojectstracker.com\/blog\/?p=12040"},"modified":"2023-01-25T10:09:35","modified_gmt":"2023-01-25T10:09:35","slug":"sandur-manganese-iron-ores-ltd-update-on-ductile-iron-pipe-project","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/sandur-manganese-iron-ores-ltd-update-on-ductile-iron-pipe-project\/","title":{"rendered":"Sandur Manganese &#038; Iron Ores Ltd update on Ductile Iron pipe project"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/12040?pdf=12040\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img class=\"\" src=\"https:\/\/newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/01\/iron-ore-beneficiation-plant.jpg\" width=\"345\" height=\"230\" \/><\/p>\n<p>The <a href=\"http:\/\/sandurgroup.com\/\">Sandur Manganese &amp; Iron Ores Limited<\/a>&#8216;s Board of Directors had taken into consideration and noted the modification to the Environmental Clearance (EC) granted by the Ministry of Environment, Forest and Climate Change (&#8216;MOEFCC&#8217;) Government of India for the change in plant configuration and product mix for the Company&#8217;s plant located at Hanumanahalli Village, HosapeteTaluk, Vijayanagara District, Karnataka and had given in-principle approval for taking up the projects<\/p>\n<p>The Board approved meeting the financing requirements through internal accruals and borrowings at its 360th meeting, which was held on November 10, 2022.<\/p>\n<p>The Board had previously considered the Detailed Project Report (DPR) for DI pipe and had anticipated a capital outlay of about Rs 2,200 crore for the project.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report The Sandur Manganese &amp; Iron Ores Limited&#8216;s Board of Directors had taken into consideration and noted the modification to the Environmental Clearance (EC) granted by the Ministry of Environment, Forest&#8230; <\/p>\n","protected":false},"author":4,"featured_media":4115,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[163],"tags":[610],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/01\/iron-ore-beneficiation-plant.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/12040"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=12040"}],"version-history":[{"count":1,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/12040\/revisions"}],"predecessor-version":[{"id":12041,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/12040\/revisions\/12041"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/4115"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=12040"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=12040"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=12040"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}