{"id":11954,"date":"2022-11-07T05:24:30","date_gmt":"2022-11-07T05:24:30","guid":{"rendered":"https:\/\/newprojectstracker.com\/blog\/?p=11954"},"modified":"2023-01-25T10:33:49","modified_gmt":"2023-01-25T10:33:49","slug":"seci-invites-bids-for-1200-mw-wind-solar-hybrid-projects","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/seci-invites-bids-for-1200-mw-wind-solar-hybrid-projects\/","title":{"rendered":"SECI invites bids for 1,200 MW wind-solar hybrid projects"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/11954?pdf=11954\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img class=\"\" src=\"https:\/\/newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/05\/Tata-Power-Renewables-inaugurates-120MW-solar-project-in-Gujarat.jpg\" width=\"410\" height=\"228\" \/><\/p>\n<p>The 1,200 megawatt (MW) ISTS-connected wind-solar hybrid projects will be set by project developers chosen by the state-run <a href=\"https:\/\/www.seci.co.in\/\">Solar Energy Corporation of India (SECI)<\/a>.<\/p>\n<p>The hybrid power developer (HPD) must put up the energy storage system-enabled hybrid projects (ESS). For every 100 MW of project capacity, an obligatory ESS with a minimum 100 MWh capacity must be implemented. The deadline for bid submission is December 14.<\/p>\n<p>Under the tariff-based competitive bidding, the projects include a guaranteed peak power supply in India on a Build Own Operate (B-O-O) basis (Tranche-VI). The hybrid power developer must be responsible for connectivity and Long-Term Open Access.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report The 1,200 megawatt (MW) ISTS-connected wind-solar hybrid projects will be set by project developers chosen by the state-run Solar Energy Corporation of India (SECI). The hybrid power developer (HPD) must&#8230; <\/p>\n","protected":false},"author":4,"featured_media":7599,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[163],"tags":[284],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/05\/Tata-Power-Renewables-inaugurates-120MW-solar-project-in-Gujarat.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/11954"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=11954"}],"version-history":[{"count":1,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/11954\/revisions"}],"predecessor-version":[{"id":11955,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/11954\/revisions\/11955"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/7599"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=11954"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=11954"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=11954"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}