{"id":11661,"date":"2022-10-20T11:18:49","date_gmt":"2022-10-20T11:18:49","guid":{"rendered":"https:\/\/newprojectstracker.com\/blog\/?p=11661"},"modified":"2023-01-27T05:00:41","modified_gmt":"2023-01-27T05:00:41","slug":"kp-energy-ltd-receives-order-from-abrel-century-energy-limited","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/kp-energy-ltd-receives-order-from-abrel-century-energy-limited\/","title":{"rendered":"KP Energy Ltd receives order from ABREL Century Energy Limited"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/11661?pdf=11661\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img class=\"\" src=\"https:\/\/newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/02\/Asian-Energy-services.jpg\" width=\"314\" height=\"209\" \/><\/p>\n<p>ABREL <a href=\"http:\/\/ceslintlgroup.com\/subsidiaries\/cesl\/\">Century Energy Limited<\/a> has given <a href=\"https:\/\/kpenergy.in\/\">KP Energy Ltd<\/a> the go-ahead to erect and install 5 Nos. Suzlon make wind-operated electricity generators (commonly known as wind mills or WTG) of model 5120 at the Vinjalpar site in Gujarat.<\/p>\n<p>These generators have a rated capacity of 2100 kW (two thousand one hundred kilowatts) and have a hub height of one hundred and forty (140) metres.<\/p>\n<p>ABREL <a href=\"http:\/\/ceslintlgroup.com\/subsidiaries\/cesl\/\">Century Energy Limited<\/a> is developing the Site, and <a href=\"https:\/\/kpenergy.in\/\">KP Energ<\/a>y will offer services such on-site loading and unloading of WTG materials, inter-carting of WTG, and erection and installation of the WTGs. The project is expected to be finished in Q3FY23, and KP Energy has already begun carrying out its scope of work.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report ABREL Century Energy Limited has given KP Energy Ltd the go-ahead to erect and install 5 Nos. Suzlon make wind-operated electricity generators (commonly known as wind mills or WTG) of&#8230; <\/p>\n","protected":false},"author":1,"featured_media":4952,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[163],"tags":[847,848],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/02\/Asian-Energy-services.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/11661"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=11661"}],"version-history":[{"count":3,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/11661\/revisions"}],"predecessor-version":[{"id":14052,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/11661\/revisions\/14052"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/4952"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=11661"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=11661"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=11661"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}