{"id":11647,"date":"2022-10-20T10:39:15","date_gmt":"2022-10-20T10:39:15","guid":{"rendered":"https:\/\/newprojectstracker.com\/blog\/?p=11647"},"modified":"2023-01-27T05:18:02","modified_gmt":"2023-01-27T05:18:02","slug":"suzlon-energy-announces-receiving-wind-power-project-from-adani-green-energy","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/suzlon-energy-announces-receiving-wind-power-project-from-adani-green-energy\/","title":{"rendered":"Suzlon Energy announces receiving wind power project from Adani Green Energy"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/11647?pdf=11647\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img src=\"https:\/\/newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/12\/Wind-Power-Projects.jpg\" \/><\/p>\n<p><a href=\"https:\/\/www.suzlon.com\/\">Suzlon Energy<\/a> announced it had received an order from <a href=\"https:\/\/www.adanigreenenergy.com\/\">Adani Green Energy<\/a> to create a 48.3 MW wind power project.<\/p>\n<p>23 of <a href=\"https:\/\/www.suzlon.com\/\">Suzlon Energy<\/a>&#8216;s wind turbine generators (WTGs) with a Hybrid Lattice Tubular (HLT) tower and a rated capacity of 2.1 MW each will be installed. The project will be completed in 2023 and is situated in Mandvi, Kutch, Gujarat.<\/p>\n<p>The business claimed in a regulatory filing that this purchase, a repeat order from <a href=\"https:\/\/www.adanigreenenergy.com\/\">Adani Green Energy Ltd.<\/a>, is in addition to the 226.8 MW order that was previously disclosed on August 13th, 2021.<\/p>\n<p><a href=\"https:\/\/www.suzlon.com\/\">Suzlon<\/a> will execute the project with a scope of supply, installation, and commissioning. Additionally, <a href=\"https:\/\/www.suzlon.com\/\">Suzlon<\/a> will offer post-commissioning operation and maintenance services.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report Suzlon Energy announced it had received an order from Adani Green Energy to create a 48.3 MW wind power project. 23 of Suzlon Energy&#8216;s wind turbine generators (WTGs) with a&#8230; <\/p>\n","protected":false},"author":1,"featured_media":3615,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[163],"tags":[393,853],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/12\/Wind-Power-Projects.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/11647"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=11647"}],"version-history":[{"count":2,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/11647\/revisions"}],"predecessor-version":[{"id":14061,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/11647\/revisions\/14061"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/3615"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=11647"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=11647"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=11647"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}