{"id":11396,"date":"2022-10-11T11:59:38","date_gmt":"2022-10-11T11:59:38","guid":{"rendered":"https:\/\/newprojectstracker.com\/blog\/?p=11396"},"modified":"2023-06-30T10:20:12","modified_gmt":"2023-06-30T10:20:12","slug":"new-projects-by-adani-hybrid-energy-jaisalmer-fivem-alimco-auxiliary-production-centre-and-coromandel-international","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/new-projects-by-adani-hybrid-energy-jaisalmer-fivem-alimco-auxiliary-production-centre-and-coromandel-international\/","title":{"rendered":"New Projects by Adani Hybrid Energy Jaisalmer Fivem, ALIMCO Auxiliary Production Centre and Coromandel International"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/11396?pdf=11396\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><a href=\"http:\/\/www.newprojectstracker.com\/projects\/new-projects-by-generation-plant-in-jaipur-rajasthan-paa30566\"><strong>Adani Hybrid Energy Jaisalmer Five&#8217;s New Power Generation Plant<\/strong><\/a><\/p>\n<p><a href=\"https:\/\/www.thecompanycheck.com\/company\/adani-green-energy-twenty-nine-limited\/U40300GJ2020PLC111951\">Adani Hybrid Energy Jaisalmer Five<\/a> is planning to take up in new power generation plant in Jaipur, Rajasthan . The project involves construction of new power generation plant 600 MWac. The company has filed industrial entrepreneurs&#8217; memorandum on July 2022. As of October 2022, the project is in planning stage.<\/p>\n<p><a href=\"http:\/\/www.newprojectstracker.com\/projects\/new-projects-by-tricycle-mfg-expansion-project-in-ujjain-paa30567\"><strong>ALIMCO Auxiliary Production Centre&#8217;s Tricycle Mfg. Expansion Project<\/strong><\/a><\/p>\n<p><a href=\"https:\/\/www.alimco.in\/WriteReadData\/Tender_Document\/AAPC-BGL-LT-55-AY1\/1_(1)AAPC-BGL-LT-55-AY.pdf\">ALIMCO Auxiliary Production Centre<\/a> is planning to take up a Tricycle Mfg. Expansion Project in Patwari Halka, Manpura, Ujjain, Madhya Pradesh. The project involves expanding the manufacturing capacity of tricycle (27,000 Nos\/Year), wheelchairs (from 14000 Nos\/Y to 30000 nos\/Y), Axila from 30,000 Nos\/Y to 40000 Nos\/Y, Elbow Crutch 9000 Nos\/Y, Walking stick from 14000 Nos\/Y to 30000 Nos\/Y, Etc. The project is estimated to cost Rs.210 million. As of October 2022, the company has received consent from the state pollution control authorities to establish the project<\/p>\n<p><strong>To access all new projects covered today, download the report<\/strong><\/p>\n<p><img src=\"https:\/\/newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/10\/imageedit_1_9634677552.jpg\" \/><\/p>\n<p><strong><a href=\"https:\/\/www.newprojectstracker.com\/online?_ga=2.247560583.1051731023.1665574012-482399943.1663235295\">Download Daily Projects Report \u2013 Issue No : 353<\/a><\/strong><\/p>\n<p>The Daily Project Report compiled from new projects updated on the previous day is sent to all paid subscribers and has 15 New Projects in Energy, Infrastructure, Chemicals, Textiles, Paper, Cement, Steel, Water Treatment and other Manufacturing Projects in India<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report Adani Hybrid Energy Jaisalmer Five&#8217;s New Power Generation Plant Adani Hybrid Energy Jaisalmer Five is planning to take up in new power generation plant in Jaipur, Rajasthan . The project&#8230; <\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[10],"tags":[],"jetpack_featured_media_url":"","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/11396"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=11396"}],"version-history":[{"count":4,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/11396\/revisions"}],"predecessor-version":[{"id":17803,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/11396\/revisions\/17803"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=11396"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=11396"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=11396"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}