{"id":11113,"date":"2022-09-22T09:18:13","date_gmt":"2022-09-22T09:18:13","guid":{"rendered":"https:\/\/newprojectstracker.com\/blog\/?p=11113"},"modified":"2023-06-16T06:49:28","modified_gmt":"2023-06-16T06:49:28","slug":"ashoka-buildcon-receives-loa-from-south-western-railway","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/ashoka-buildcon-receives-loa-from-south-western-railway\/","title":{"rendered":"Ashoka Buildcon receives LoA from South Western Railway"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/11113?pdf=11113\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img src=\"https:\/\/newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/05\/Indian-Railway-floats-tender-for.jpg\" \/><\/p>\n<p><a href=\"https:\/\/www.ashokabuildcon.com\/\">Ashoka Buildcon Limited<\/a> had submitted its bid to the South Western Railway (&#8220;SWR&#8221;) and the Company has received a Letter of Acceptance (LOA) from SWR.<\/p>\n<p>As per a filing, the LoA is for the Project viz. &#8216;Construction of New BG Line Between Chainage 192.000 and Chainage 171.640 including Electrical &amp; Telecommunication Works Between Tolahunse (Ex.) &amp; Bharmasagar (Ex.) Stations on Engineering, Procurement &amp; Construction (EPC) Mode&#8217; (&#8220;Project&#8221;).<\/p>\n<p>Further, the accepted Bid Project Cost for the Project is Rs258.12 crore.<\/p>\n<p>The completion period is 24 months from the date of Appointed Date, the company said<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report Ashoka Buildcon Limited had submitted its bid to the South Western Railway (&#8220;SWR&#8221;) and the Company has received a Letter of Acceptance (LOA) from SWR. As per a filing, the&#8230; <\/p>\n","protected":false},"author":1,"featured_media":8528,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[163],"tags":[1235],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/05\/Indian-Railway-floats-tender-for.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/11113"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=11113"}],"version-history":[{"count":2,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/11113\/revisions"}],"predecessor-version":[{"id":17166,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/11113\/revisions\/17166"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/8528"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=11113"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=11113"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=11113"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}