{"id":10872,"date":"2022-09-09T05:48:20","date_gmt":"2022-09-09T05:48:20","guid":{"rendered":"https:\/\/newprojectstracker.com\/blog\/?p=10872"},"modified":"2023-06-16T08:52:12","modified_gmt":"2023-06-16T08:52:12","slug":"adani-group-to-build-three-giga-clean-energy-factories","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/adani-group-to-build-three-giga-clean-energy-factories\/","title":{"rendered":"Adani Group to build three giga clean energy factories"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/10872?pdf=10872\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img class=\"\" src=\"https:\/\/newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/12\/ntpc-gives-first-green-hydrogen-microgrid-project-to-simhadri-plant.jpg\" width=\"285\" height=\"114\" \/><\/p>\n<p>In order to produce solar panels, wind turbines, and hydrogen electrolyzers, the <a href=\"http:\/\/www.adanienterprises.com\/\">Adani Group<\/a> will construct three gigafactories as part of a $70 billion investment in sustainable energy by 2030.<\/p>\n<p>Gautam Adani, the chairman of the Adani Group, stated that the company will produce 3 million tonnes of hydrogen and an additional 45 gigawatts (GW) of renewable energy, all of which will be finished by 2030.<\/p>\n<p>\u201cThis value chain will be fully indigenous and aligned with the geopolitical needs of our nation. However, I believe we can further accelerate our goals with support from companies in the US that are willing to work with us. Both of us stand to benefit,\u201d he said after receiving the USIBC Global Leadership Award. On semiconductor, he said it is essential to almost all sectors.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report In order to produce solar panels, wind turbines, and hydrogen electrolyzers, the Adani Group will construct three gigafactories as part of a $70 billion investment in sustainable energy by 2030&#8230;. <\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[163],"tags":[249],"jetpack_featured_media_url":"","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/10872"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=10872"}],"version-history":[{"count":2,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/10872\/revisions"}],"predecessor-version":[{"id":17178,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/10872\/revisions\/17178"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=10872"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=10872"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=10872"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}