{"id":10870,"date":"2022-09-09T05:44:22","date_gmt":"2022-09-09T05:44:22","guid":{"rendered":"https:\/\/newprojectstracker.com\/blog\/?p=10870"},"modified":"2023-06-16T08:53:26","modified_gmt":"2023-06-16T08:53:26","slug":"suzlon-group-announces-wind-power-projects-in-kanakagiribad-and-bagalkot","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/suzlon-group-announces-wind-power-projects-in-kanakagiribad-and-bagalkot\/","title":{"rendered":"Suzlon Group announces wind power projects in Kanakagiribad and Bagalkot"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/10870?pdf=10870\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img class=\"\" src=\"https:\/\/newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/12\/Wind-Power-Projects.jpg\" width=\"403\" height=\"253\" \/><\/p>\n<p><a href=\"http:\/\/www.suzlon.com\/\">Suzlon Group<\/a> has announced that it would establish a 180.6 megawatt (MW) wind power project for Sembcorp&#8217;s Indian affiliate in Kanakagiribad and Bagalkot (Karnataka). The facility is anticipated to be operational in 2024.<\/p>\n<p>The homegrown wind turbine manufacturer secured the order from the Singapore-based utilities company\u2019s renewable energy (RE) subsidiary, Green Infra Wind Energy. Under the contract, the company will install 86 wind turbine generators (WTGs) with a Hybrid Lattice Tubular (HLT) tower and a rated capacity of 2.1 MW each, Suzlon said in a statement.<\/p>\n<p>Suzlon will supply the wind turbines (equipment supply) and execute the project including, erection and commissioning. Suzlon will also provide comprehensive operation, and maintenance services post commissioning, the company added.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report Suzlon Group has announced that it would establish a 180.6 megawatt (MW) wind power project for Sembcorp&#8217;s Indian affiliate in Kanakagiribad and Bagalkot (Karnataka). The facility is anticipated to be&#8230; <\/p>\n","protected":false},"author":1,"featured_media":3615,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[163],"tags":[879],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/12\/Wind-Power-Projects.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/10870"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=10870"}],"version-history":[{"count":1,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/10870\/revisions"}],"predecessor-version":[{"id":10871,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/10870\/revisions\/10871"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/3615"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=10870"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=10870"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=10870"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}