{"id":10841,"date":"2022-09-06T05:10:47","date_gmt":"2022-09-06T05:10:47","guid":{"rendered":"https:\/\/newprojectstracker.com\/blog\/?p=10841"},"modified":"2023-06-16T09:09:42","modified_gmt":"2023-06-16T09:09:42","slug":"nhai-invites-bids-for-four-laning-of-srinanar-ring-road","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/nhai-invites-bids-for-four-laning-of-srinanar-ring-road\/","title":{"rendered":"NHAI invites bids for four laning of Srinanar Ring Road"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/10841?pdf=10841\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img src=\"https:\/\/newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/07\/Centre-sanctions-34-national-highways-in-Gujarat-at-a-cost-of-Rs-3760.64-crore.jpg\" \/><\/p>\n<p>In accordance with Bharatmala Pariyojna-I, the <a href=\"http:\/\/nhai.gov.in\/\">National Highways Authority of India (NHAI)<\/a> has issued a call for bids for the four-laning of Srinagar Ring Road Phase-II in Jammu &amp; Kashmir.<\/p>\n<p>The scope of work involves engineering, procurement, and construction (EPC) upgrading the existing two-lane NH-1 to a four-lane dual carriageway from km 8.660 to km 33.775 from Sumbal to Wayul.<\/p>\n<p>The project is expected to cost Rs 617.73 crore and will take 30 months to complete.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report In accordance with Bharatmala Pariyojna-I, the National Highways Authority of India (NHAI) has issued a call for bids for the four-laning of Srinagar Ring Road Phase-II in Jammu &amp; Kashmir&#8230;. <\/p>\n","protected":false},"author":1,"featured_media":9340,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[163],"tags":[509],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/07\/Centre-sanctions-34-national-highways-in-Gujarat-at-a-cost-of-Rs-3760.64-crore.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/10841"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=10841"}],"version-history":[{"count":1,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/10841\/revisions"}],"predecessor-version":[{"id":10842,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/10841\/revisions\/10842"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/9340"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=10841"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=10841"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=10841"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}