{"id":10831,"date":"2022-09-06T04:52:48","date_gmt":"2022-09-06T04:52:48","guid":{"rendered":"https:\/\/newprojectstracker.com\/blog\/?p=10831"},"modified":"2023-06-16T09:38:49","modified_gmt":"2023-06-16T09:38:49","slug":"nhai-floats-tender-for-four-laning-of-jagtial-and-karimnagar-stretch","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/nhai-floats-tender-for-four-laning-of-jagtial-and-karimnagar-stretch\/","title":{"rendered":"NHAI floats tender for four-laning of Jagtial and karimnagar stretch"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/10831?pdf=10831\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img src=\"https:\/\/newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/07\/Centre-sanctions-34-national-highways-in-Gujarat-at-a-cost-of-Rs-3760.64-crore.jpg\" \/><\/p>\n<p>For the segment between Jagtial and Karimnagar, the<a href=\"http:\/\/nhai.gov.in\/\"> National Highways Authority of India (NHAI)<\/a> has issued a request for proposals.<\/p>\n<p>In Telangana, the scope of construction includes four-laning the Jagtial-Karimnagar portion of NH-563 from design ch 0.000 km (existing ch 90.500 on NH-63) to design ch 58.866 km (near SH-1 ch 170.400 km) at Karimnagar Bypass end (design length &#8211; 58.866 km).<\/p>\n<p>The project is expected to cost Rs. 1503.57 crore.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report For the segment between Jagtial and Karimnagar, the National Highways Authority of India (NHAI) has issued a request for proposals. In Telangana, the scope of construction includes four-laning the Jagtial-Karimnagar&#8230; <\/p>\n","protected":false},"author":1,"featured_media":9340,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[163],"tags":[509],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/07\/Centre-sanctions-34-national-highways-in-Gujarat-at-a-cost-of-Rs-3760.64-crore.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/10831"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=10831"}],"version-history":[{"count":1,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/10831\/revisions"}],"predecessor-version":[{"id":10832,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/10831\/revisions\/10832"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/9340"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=10831"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=10831"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=10831"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}