{"id":10809,"date":"2022-09-05T04:47:33","date_gmt":"2022-09-05T04:47:33","guid":{"rendered":"https:\/\/newprojectstracker.com\/blog\/?p=10809"},"modified":"2023-06-16T09:47:44","modified_gmt":"2023-06-16T09:47:44","slug":"kpi-green-energy-to-set-up-16-10-mw-hybrid-power-project-in-gujarat","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/kpi-green-energy-to-set-up-16-10-mw-hybrid-power-project-in-gujarat\/","title":{"rendered":"KPI Green Energy to set up 16.10 MW hybrid power project in Gujarat"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/10809?pdf=10809\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img src=\"https:\/\/newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/11\/green-energy2.jpg\" \/><\/p>\n<p>In accordance with the 2018 Gujarat hybrid power policy, <a href=\"http:\/\/kpigreenenergy.com\/\">KPI Green Energy<\/a> is installing green hybrid capabilities at Bhavnagar totaling 16.10 MW.<\/p>\n<p>The business said in a regulatory filing that the hybrid power project will include solar and wind capacity that will be created at its Bhungar location in Mahuva at Bhavnagar, Gujarat.<\/p>\n<p>&#8220;The requisite financial closure to the tune of Rs 132 crore has already been achieved from State Bank of India. Further, the company has arranged long-term PPAs in advance with various corporate parties for sale of power generated out of the hybrid power project upon commissioning,&#8221; the company said. The project is scheduled for commissioning in March 2023, it said.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report In accordance with the 2018 Gujarat hybrid power policy, KPI Green Energy is installing green hybrid capabilities at Bhavnagar totaling 16.10 MW. The business said in a regulatory filing that&#8230; <\/p>\n","protected":false},"author":1,"featured_media":2496,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[163],"tags":[363],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/11\/green-energy2.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/10809"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=10809"}],"version-history":[{"count":1,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/10809\/revisions"}],"predecessor-version":[{"id":10810,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/10809\/revisions\/10810"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/2496"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=10809"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=10809"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=10809"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}