{"id":10476,"date":"2022-08-12T06:45:31","date_gmt":"2022-08-12T06:45:31","guid":{"rendered":"https:\/\/newprojectstracker.com\/blog\/?p=10476"},"modified":"2023-01-28T11:41:55","modified_gmt":"2023-01-28T11:41:55","slug":"hitachi-rail-sts-bags-major-cmrl-contract","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/hitachi-rail-sts-bags-major-cmrl-contract\/","title":{"rendered":"Hitachi Rail STS bags major CMRL contract"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/10476?pdf=10476\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p>&nbsp;<\/p>\n<p><img src=\"https:\/\/newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/07\/Alstom-to-deliver-156-Movia-metro-cars-for-MPMRCL.jpg\" \/>The contract for the signalling, train control, and video management systems for Chennai Metro Line-3 was awarded to <a href=\"https:\/\/www.hitachirail.com\/\">Hitachi Rail STS India Pvt. Ltd<\/a>. last week because it had submitted the lowest proposal.<\/p>\n<p>In order to connect Madhavaram with SIPCOT 2, the new 45.81 km, primarily subterranean line of the 119.8 km Chennai Metro Phase 2 project will go north-south.<\/p>\n<p>In August 2021, <a href=\"https:\/\/chennaimetrorail.org\/\">Chennai Metro Rail Ltd<\/a>. (CMRL) issued a call for bids for this contract, with a 1640-day (4.5-year) deadline and an undetermined estimate. In May, technical bids were opened, revealing 2 bidders.<\/p>\n<p>Other conventional bidders, including Siemens and Alstom, were not interested in participating since this contract is being financed by a loan from the Japan International Cooperation Agency (JICA), which has strict requirements regarding the amount of Japanese content.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report &nbsp; The contract for the signalling, train control, and video management systems for Chennai Metro Line-3 was awarded to Hitachi Rail STS India Pvt. Ltd. last week because it had&#8230; <\/p>\n","protected":false},"author":4,"featured_media":9539,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[163],"tags":[285,646],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/07\/Alstom-to-deliver-156-Movia-metro-cars-for-MPMRCL.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/10476"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=10476"}],"version-history":[{"count":1,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/10476\/revisions"}],"predecessor-version":[{"id":10477,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/10476\/revisions\/10477"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/9539"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=10476"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=10476"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=10476"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}