{"id":10393,"date":"2022-08-09T05:28:30","date_gmt":"2022-08-09T05:28:30","guid":{"rendered":"https:\/\/newprojectstracker.com\/blog\/?p=10393"},"modified":"2023-01-30T11:28:18","modified_gmt":"2023-01-30T11:28:18","slug":"nhai-floats-tenders-for-construction-of-four-lane-highway","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/nhai-floats-tenders-for-construction-of-four-lane-highway\/","title":{"rendered":"NHAI floats tenders for construction of four-lane highway"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/10393?pdf=10393\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img src=\"https:\/\/newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/10\/Mega-National-Highways-Project.jpg\" \/><\/p>\n<p>For the construction of a four-lane highway in the state of Uttar Pradesh, the<a href=\"https:\/\/nhai.gov.in\/#\/\"> National Highways Authority of India (NHAI)<\/a> has issued two distinct invitations for bids.<\/p>\n<p>Construction of a four-lane highway on the greenfield portion of NH-31: Package-I [from Hridaipur (0.000 km) to Shahapur (42.500 km)] is included in the project&#8217;s scope of work. The project is expected to cost Rs. 845.28 crore.<\/p>\n<p>Another tender is for the building of the NH-31: Package-II [from Shahapur (42.500 km) to Pindari (78.150 km)] four-lane highway from Gazipur-Ballia- Uttar Pradesh\/Bihar State Border. The project is expected to cost Rs. 845.28 crore.<\/p>\n<p>Each project will take 24 months to complete<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report For the construction of a four-lane highway in the state of Uttar Pradesh, the National Highways Authority of India (NHAI) has issued two distinct invitations for bids. Construction of a&#8230; <\/p>\n","protected":false},"author":1,"featured_media":1628,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[163],"tags":[509],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/10\/Mega-National-Highways-Project.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/10393"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=10393"}],"version-history":[{"count":1,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/10393\/revisions"}],"predecessor-version":[{"id":10394,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/10393\/revisions\/10394"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/1628"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=10393"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=10393"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=10393"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}