{"id":10350,"date":"2022-08-05T05:04:57","date_gmt":"2022-08-05T05:04:57","guid":{"rendered":"https:\/\/newprojectstracker.com\/blog\/?p=10350"},"modified":"2023-01-30T11:42:46","modified_gmt":"2023-01-30T11:42:46","slug":"nhai-invites-bids-for-four-laningof-nh-139w-in-bihar","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/nhai-invites-bids-for-four-laningof-nh-139w-in-bihar\/","title":{"rendered":"NHAI invites bids for four-laningof NH-139W in Bihar"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/10350?pdf=10350\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img src=\"https:\/\/newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/05\/Centre-gives-green-signal-for-Vijayawada-Nagpur-express-highway.jpg\" \/><\/p>\n<p>The NHAI (National Highways Authority of India) has issued a request for proposals for the 44.800 km section of NH-139W in Bihar that would be four-laned.<\/p>\n<p>The Bharatmala Pariyojna&#8217;s hybrid annuity mechanism (<a href=\"https:\/\/pas.org.in\/Portal\/document\/UrbanSanitation\/uploads\/Hybrid%20Annuity%20Model%20for%20Sanitation%20April%2023%202018.pdf\">HAM<\/a>) is being used to build and upgrade the current Manikpur to Sahebganj stretch of NH-139W from kilometre 0.000 to km 44.800 to four lanes.<\/p>\n<p>The project is expected to cost Rs. 1,269.01 crore.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report The NHAI (National Highways Authority of India) has issued a request for proposals for the 44.800 km section of NH-139W in Bihar that would be four-laned. The Bharatmala Pariyojna&#8217;s hybrid&#8230; <\/p>\n","protected":false},"author":4,"featured_media":8239,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[163],"tags":[509],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/05\/Centre-gives-green-signal-for-Vijayawada-Nagpur-express-highway.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/10350"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=10350"}],"version-history":[{"count":2,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/10350\/revisions"}],"predecessor-version":[{"id":14331,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/10350\/revisions\/14331"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/8239"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=10350"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=10350"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=10350"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}